Secure it to the roof by driving in two nails near the top edge of the shingle about 1 inch below its top edge.
How to install cedar shake roof ridge cap.
Position the first shingle so its end overhangs the edge of the roof by 1 1 4 to 1 1 2 inches.
Install the uppermost layer by trimming the top edge of the each shake with a circular.
Call us at 1 877 850 1767 for more info.
Intersecting roof surfaces at hips and ridges should be capped to ensure a weathertight joint.
It covers about 5 on each side of your hip or ridge and 16 lineal feet in a bundle.
Roof installation trick for ridge cap.
Integrity roofing and painting llc video demonstrates how to get an added layer of protection on the ridge.
On steep slope roofs the correct ridge vent products can actually facilitate the ease of installation of certi label ridge units.
Line the entire roof peak with a good adhesive membrane that the roof caps will adhere to.
A cedar shake roof ridge cap isn t difficult to create.
Make sure all shingles on each side are covered.
This product is made from a 5 8 thick x 24 long tapersawn shake to match your shake job.
Once all the shingles are nailed to the roof decking construct the cedar shingles.
Use this precut cedar hip and ridge cap from best quality cedar products to finish off the peak and hips on your roof.
The predominant ridge material manufactured today is for a medium slope roof.
Always follow the manufacturer s installation instructions.
Hand split resawn shake hip ridge cap unites ridge cap shingles ridge cap unites the appropriate hip and ridge cap units should be selected to match the adjacent shingles or shakes.
There are a number of key steps you need to take to avoid mucking this part up.
Check the rest of the roof installation to ensure the cedar shakes or shingles laid on the roof up to the ridge are properly installed in straight rows.
This is an area of the roof which requires extra care and skill.
Cedar roof installation and roofing installation tips videos.