Unroll the paper on the roof and cut it to the correct length with a utility knife.
Installing tar paper on hip roof.
For hip type shed roofs which include slopes on all 4 sides begin at the square hip at the top of the roof.
Begin at the bottom edges of the roof and go up.
Begin your first row of tar paper with the bottom of the tar paper.
Then i run a r.
Staple it to the plywood with a staple gun placing the staples at 6 to 8 inch intervals along the edges and in the middle of the paper.
Adjust the felt as you roll it making sure that it s straight with no bubbling.
Drip edges on the eaves any valley liners and all flashing should be installed before the tar paper is laid.
Multiply the width by the height for the.
Measure the width and height of each section separately.
Roofing felt comes in rolls that feature pre marked lines 2 to 3.
Start at the bottom side of the gable and overlap the sections of drip edge a few inches as you work your way up the roof see figure a.
How to lay roofing felt on a hip roof.
Start at the bottom of one side of the roof at the right or left edge.
This video walks through the very basic steps for installing tarpaper felt.
Take a close look at how i paper the 30 in the center of the valley.
Install the drip edge on the gable ends of the roof after you finish installing your underlayment.
Never install the felt vertically across your roof.
Some roofers prefer to attach felt underlayment with 1 inch roofing nails or special nails with plastic washers but most codes allow staples which are easier to drive.
Starting a roof with tarpaper felt.
After this lines should be snapped every 34 as you move up the roof.
Measure your roof s surface in square feet and purchase enough tar paper to cover the entire surface twice.
Lay the first course of tar paper lengthwise on the roof so one edge is covering the drip edge nailed to the roof.
How to install roofing tar paper step 1.
Position the first row of roofing felt flush on the bottom with the edge of the gutter apron.
Measure the size of your roof in square feet.
Setting the roll and then nailing off.
Lay the next strip.
Chalk lines should be snapped 33 5 8 above the eave line.
Use a tin snips to cut the drip edge to size.
Before applying roofing you ll need to cover the sheathing with roofing felt also often called tar paper most local codes call for using 30 pound felt.
Use a ladder to reach the bottom level of the roof.
Lay the first strip of tar paper side to side with its bottom.
How to install roofing tar paper.
Have a helper ready to assist with this step and take care to get the lines straight and clean.
This is how i paper my vallies.