Installing panel siding all lp smartside panel siding may be installed over 16 on center framing.
Installing smartside wood siding panels.
0 4375 in x 48 563 in x 95 875 in item 88997 model xssp25915.
Tn 028 vertical siding.
Check your local building codes before starting to install siding to confirm if wood structural panel wall sheathing is required.
The installation instructions recommend nails with a shank diameter of at least 113 inches and a head diameter of at least 27 inches.
Butt joints should be staggered over successive courses.
Installation is basically the same regardless of how.
Precision series panel siding.
As in standard construction practices install smartside siding by nailing to studs spaced 16 inches on center using hot dipped galvanized nails.
0 375 in x 48 in x 96 in.
Smartside 76 primed engineered treated wood siding panel common.
Some panel siding is installed with vertical wood battens over seams while other panels have tongue and groove joints to make a solid surface.
Lp smartside 76 series lap siding may be attached directly to framing members spaced a maximum of 24 inches 610 mm o c.
Lp smartside trim fascia.
Engineered wood siding installs faster.
How to install lp smartside trim siding.
Lp smartside trim siding products are treated with our proprietary smartguard process.
When installed over 24 on center framing you must use precision 190 series panel siding.
Lp smartside strand substrate panel siding.