Install the vapor.
Installing siding over asbestos siding.
However removing the asbestos siding first though more expensive is the best alternative in the long run.
Nail it in place using several nails a few inches apart until the top of the plastic is fully attached.
Make sure that there are no loose or.
This practice is not recommended for a number of reasons.
Place the top edge of the plastic sheeting at the top of the exterior wall above the siding.
Inspect the outside of the home for any damages to the asbestos siding.
First the siding installation process itself nailing into the existing boards or tiles is enough to disturb the existing material and create a dangerous condition.
Some people attempt to solve the problem of deteriorating asbestos siding by installing vinyl siding over top of it.
Measure the house for siding and the backer board.
But be sure to check your local building codes first to see if it is allowed in your area.
Applying a layer of sheathing or sheets of foam insulation over the asbestos then covering it with vinyl siding is a common practice.
The simplest way to do this is to use a tape measure to.
How to put siding on over asbestos step 1.
I ve seen house fires where the vinyl siding burned off only to reveal the superior asbestos shingles underneath which saved the house.
If the job had been done right the house would have been a total loss.