Snap a chalkline 2 to 3 inches past the valley center on the top layer of shingles.
Installing roof valley shingles.
Center a minimum 610 mm 24 wide minimum 28 gauge pre finished galvanized metal valley liner in the valley and fasten with only enough nails to hold it in place nailing at the edges only.
Ensure ice and water protector has been installed along the valley first.
In general the closed cut valley method implies stretching one side of the shingles beyond the valley while those on the other side are trimmed.
If you are looking to install shingles you might want to consider the closed cut valley method it is popular because the two roof planes do not need to be shingled at the same time.
To secure the roof valley flashing nail it down carefully.
Lay one and two tab shingles as you near the valley so full size shingles will run across the valley.
How to shingle a valley with architectural shingles.
Shingle the other side of the valley the same way.
Do not use a shingle trimmed to less than 25 cm in length to finish a course running into a valley.
Roof one side of the valley running the shingles across it.
Once you ve done that cut your shingles to size if they re not already.
Be mindful of the proper nailing technique so that your nails always hold the top edge of the course beneath it.
Install your roof shingles now that you ve conquered the underlayment and drip edge and plotted your course it s time to truly learn how to install roof shingles.
If necessary trim a part off the adjacent shingle in the course to allow a longer portion to be used.
Overlap each metal piece by at least 150 mm 6 and use asphalt plastic cement under each section of overlap.
Glue the valley end of each shingle with bituminous mastic.
Apply an approximately 3 inch width of asphalt roofing cement along the sides of flashing and embed shingles in mastic.
Nail the shingles 5 cm back from the chalk line.
To install asphalt shingles start by installing underlayment and new flashing on the roof.
Stop nailing 6 inches from the center.
Install an underlayment centered in the roof valley.
Working your way up and across begin laying your courses.