Home centers sell rolls of 6 in.
Installing a gutter drip edge.
This is important to protect damage to your fascia soffits rafters.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Place a nail at one end then the other.
Begin installation it is best to install a drip edge on a day with warm weather because it makes it easier for the shingles to be stripped back.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
With without rain gutters.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Make sure the drip edge coming from the shingle is bending against the fascia board because when it rains it s going.
Other causes of the water running behind the gutter if properly installed are roofing not extended 3 8 past drip edge improper overlap of drip edge ice.
Begin at the lower corner of the roof and gradually progress to the top.
Tools supplies tin sn.
Make sure to support the long end of the cut if you let it fall after cutting it will bend down and kink the drip edge.
One of the reasons is that your shingles may be too short.
Slide the corner tight to the fascia.
If the gutter is not behind the drip edge there is a chance that rain or melting snow may not fall from the edge of the drip edge but instead cling to the metal and run behind the gutter.
If using a type c drip edge you can install a furring strip to increase its performance.
Raise the shingles and push the top rim of your drip edge beneath them.
Don t exceed it more than 16 inches.
There are two reasons for water getting behind the gutter.
If it doesn t pull the drip edge out slightly from under the shingles.
Be sure to tuck the drip edge under the starter strip and felt paper.
Installing drip edge on your roof.
For drip edge installation align it for directing water flow into gutter alongside the roof edges.
How to install a drip edge.
You can use nails to tightly secure it.
Make sure the outer edge extends over the gutter.
Ideally it is recommended to nail about every 12 inches.
Use tin snips to cut the gutter apron flashing roll in two 3 in.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
You may need to nail through the starter strip into the drip edge.
A furring edge is a strip of one by two wood you install on the vertical surface of the house just beneath the roof s edge.
While the vertical leg should be placed 1 4 1 2 away from the fascia.