Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
How to install roll roofing shingles.
Nail it in place with roofing nails that penetrate at least 3 4 inch into.
Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
Install roll roofing measure 35 inches up from the eaves at several intervals along the roof and mark them.
Mark a chalk line to identify the end of your first layer.
Spread the roofing cement along the.
Use a trowel to scoop up the roofing cement.
Snap a chalk line as a guide for the first layer roofing.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
Apply roofing cement to the roof.
Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the valley.
Repeat this on both sides of the roof.
To seal a plumbing vent spread roofing.
Drip edge or drip cap is either plastic or sheet metal.
Use the chalk line to snap a straight line vertically every 6 inches.
Do not use the eaves as a guide instead because they can be uneven.
Plan so that no two butt joints are closer than 2 feet from each other.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
The strips should always be horizontal.
For extra durability you may install roll roofing in two layers.
How to do it attach first course.
It also helps if you first install a layer of roofing felt.
Installing the rolled roofing 1.
Using a measuring tape measure 35 inches 89 cm up from.
Cut the rolled roofing.