Install the starter course.
How to install drip edge flashing on roof.
The starter course is comprised of a shingle that s roughly half the width of the field shingles.
How to install drip edge flashing to a new roof to install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Measure the length of the eave you need to cover with drip edge using a tape measure.
Install the drip edge by fitting it on the roof eave pushing it tightly against the edge of.
The drip edge should be installed on top of the underlayment at all rakes and below or on top of the underlayment at the eaves.
At the eaves when installing the drip edge on top the underlayment a 4 inch wide layer of asphalt roof cement complying with the astm d4586 type i or type ii is required.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Place a nail at one end then the other.
Select enough lengths of flashing to cover it.
4 deep nail the drip edge to the sheathing every 16 if installing multiple runs of drip edge lap them by 1 4 1 2 inch keeping the nail back from the lapped joint.
Slide the corner tight to the fascia.
Make sure to support the long end of the cut if you let it fall after cutting it will bend down and kink the drip edge.
How to install drip edge flashing on a roof hunker.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
Using drip edge with a nailing edge approx.
Learn more about drip edge at.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Be sure to tuck the drip edge under the starter strip and felt paper.