While the vertical leg should be placed 1 4 1 2 away from the fascia.
How to install drip edge flashing on existing roof.
You may need to use a putty knife to break the seam between the first course and the starter strip.
If it doesn t pull the drip edge out slightly from under the shingles.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Coat the flat part of the flashing that sits on the deck using a putty knife.
Use a flat pry bar to remove drip edge nails along the eave and rakes.
Typically flashing is installed using roofing nails and roofing cement.
Slide the flat bar under starter course and pry out the nails.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Apply roofing cement when installing drip edge on an existing roof.
4 deep nail the drip edge to the sheathing every 16 if installing multiple runs of drip edge lap them by 1 4 1 2 inch keeping the nail back from the lapped joint.
At the eaves when installing the drip edge on top the underlayment a 4 inch wide layer of asphalt roof cement complying with the astm d4586 type i or type ii is required.
The drip edge should be installed on top of the underlayment at all rakes and below or on top of the underlayment at the eaves.
In order to properly install new flashing you ll have to remove the shingles surrounding your old flashing and then re lay them after installation.
Make sure the outer edge extends over the gutter.
This will allow for expansion and contraction and prevent buckling.
Secure the drip edge with roofing cement.
How to install drip edge flashing to a new roof to install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Using drip edge with a nailing edge approx.
How to install a drip edge.
Lift the shingles slide the drip edge underneath them and position it so that it extends over the gutters then replace the shingles and push down to seat the drip edge.
The starter course is comprised.
At 7 05 paul begins replacing the drip edge roof flashing.