Mark the wall for vertical furring strips installed 16 inch on center.
How to fur a concrete wall.
Using the level plumb down the wall and draw a line for reference.
Determine spacing and location of furring strips.
Determine the desired position of the furring strips or 2x4s before drilling any holes.
With a pencil or a marker draw vertically lines from.
How to frame poured walls.
Using a hammer drill drill holes using the correct diameter carbide tipped masonry bit for the concrete screw diameter.
You can t deny that concrete walls are efficient.
Tapcon concrete screw installation.
Now repeat this process at the top of the wall.
Mark the cinder block wall every 16 inches vertically and then every 16 inches horizontally to form a grid pattern.
Pre drill the holes in the furring strips so they do not crack when.
These markings will indicate where you will vertically attach your.
Step 2 place the first furring strip over a vertical line.
Equip yourself with a tape measure and spread it cross the bottom of the wall your about to furr out.
Clear the holes of all.
With a pencil or a.