Valleys will be open so flash them before hand with metal or two layers of roll roofing the first an 18 inch wide strip and the second 36 inches wide.
How to do rolled roofing.
How to properly install roll roofing.
Spread the roofing cement along the.
Cut the rolled roofing.
Enlist the help of one or two helpers to handle the long strips.
Mark a chalk line to identify the end of your first layer.
Use a trowel to scoop up the roofing cement.
Use 1 nails for re roofing.
Installing the rolled roofing 1.
Using a measuring tape measure 35 inches 89 cm up from.
Use 1 inch nails for new roofing.
For laying the material in the corners internal and external it must be cut as a larger sheet and then to be stuck overlapped.
Roll roofing is not very pliant or flexible in cold weather of fewer than 45 degrees fahrenheit and it can crack and break if.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
To lay the rolled material on the parapets cut a piece of the desired length then mechanically attach it to the top edge of the parapet then glued to the base fabric fusing.
Step 1preparing to install rolled roofing prepare the roofing cut the roll roofing into lengths long enough to cover one run across the shed roof or of 18 whichever fits your shed better and lay them out on a flat surface to smooth them out.
Plan so that no two butt joints are closer than 2 feet from each other.
Nail it in place with roofing nails that penetrate at least 3 4 inch into.
How to do it attach first course.
Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the valley.
To seal a plumbing vent spread roofing.